Skip to content
EN/NO

Applications

One method. Hundreds of jobs.

Wherever a piece of rock or concrete has to go and everything around it must stay, the job is the same. We start in tunnels and hydropower.

People in hard hats and high-visibility clothing inspecting the rock walls of a tunnel
Tunnel inspection. The photo shows the setting, not a Rockslice job.

Where we start

Two typical jobs, first.

Tunnels

An opening in a tunnel lining

123
  1. Cables
  2. Drainage
  3. Section of lining to remove
Must go
A section of lining or rock, for a new niche or opening.
Must stay
Cables, drainage and the lining around it.
Access
From inside the tunnel.

Hydropower

Room for new equipment at a hydropower site

123
  1. Water channel
  2. Equipment
  3. Section of wall to remove
Must go
A section of concrete, to fit replacement equipment.
Must stay
Water channels, machinery and the structure around it.
Access
Tight spaces, within a planned shutdown.

Illustrations of typical jobs.

Where it goes next

The same job shows up everywhere.

Not tested yet. We start where the need is sharpest.

  • Buildings

    New openings and shafts in buildings in use.

  • Foundations

    Trim or remove a foundation next to what stays.

  • Retaining walls

    Openings and changes in walls that hold back ground.

  • Bridges

    Concrete in structures that stay in service.

  • Utility crossings

    Close to pipes and cables that stay in service.

  • Concrete rehabilitation

    Remove a damaged section and keep the rest.

  • Industrial plants

    Changes inside plants that keep running.

  • Shafts

    Preparing or altering shafts from one side.

Why it fits all of them

Why the same method fits all of them.

  1. One side access

    The whole system works from the side you can reach.

  2. Cut only what must go

    A narrow slot around the piece, not breaking around it.

  3. Everything around stays

    Cables, pipes, water and structure are left in place.

Is there a job like this on your site?

Useful to include: what must go, what is around it, when the work can happen, and where a rig and pump could stand.